
Nutraceutical Packaging
The pack and the ingredient inside it, sourced on one account from plants that already supply the pharmaceutical sector.
Nutraceutical brands sit between the food and pharmaceutical supply chains and frequently get the worst of both: food-grade documentation against pharmaceutical-grade expectations. Sourcing from cGMP plants closes that gap without a pharmaceutical price.
Custom closures at a low MOQ set by the project means a new SKU does not need a million-unit commitment to justify its own pack, which matters in a category where the line-up turns over constantly.

Products for this industry

Blister Films
Forming films from a Class 100,000 clean room, in mono through pentaplex structures, with the barrier matched to your product's moisture sensitivity and the form-ability matched to your cavity depth.

Pharmaceutical Lidding Films
The foil that seals the blister, specified against your forming film and your machine — in blister, tropical, strip and child-resistant constructions.

Pharmaceutical Laminates
Three-ply and four-ply barrier structures specified against your product's moisture and light sensitivity, its stability data and the regulatory pack it has to clear — including child-resistant foil where the market requires it.

Dropper Assemblies
Dosage control for liquid oral formats — pipette, teat and cap specified together, with child-resistant closures and volume markings matched to the dose.

Active Pharmaceutical Ingredients (API)
More than 400 molecules across 28 therapeutic categories, each cGMP-certified to USP, EP, BP or IP, with the documentation pack your filing and your QA release both require.

Excipients
Binders, fillers, disintegrants, coatings and functional excipients from the same plant relationships and under the same documentation standard as the API range.
What this buyer typically sources
- Active ingredients and excipients
- Flexible laminates for single-serve formats
- Blister films and lidding foil
Request a Quote
Send the specification and the volume. We come back with pricing, lead time and Incoterms within two business days.



